Menu
Your Cart

30mm Isocheck Primo 30 Acoustic Overlay Board

30mm Isocheck Primo 30 Acoustic Overlay Board
30mm Isocheck Primo 30 Acoustic Overlay Board
  • Product Code: A1-1033
  • Delivery Time: 3 - 5 days
  • Brand: Isomass
  • (Tech. support: 08458383389)
  • Model and Size: 600x2400mm - 1.44m2
  • Weight: 23.00kg
Our ratings on 18-03-2024:
TrustPilot Review 4.6
4.6 out of 5 - Excellent
Google My Business Reviews
4.8 out of 5

30mm Isocheck Primo 30 Acoustic Overlay Board

Thickness: 30mm
Resilient layer thickness: 8mm
Width: 600mm
Length: 2400mm
Coverage: 1.44m2
Weight/m2: 16kg
Weight: 23kg
Impact Sound Insulation: 62dB
Airbourne sound insulation: 45dB

30mm Isocheck Primo 30 is an overlay platform system, designed for reducing sound transmission and improving acoustic performance of composite and traditional steel and timber joisted floors in kitchen and bathroom areas. The system is used in masonry and timber frame new build, kitchen and bathrooms refurbishment and conversion applications, able to meet the requirements of the Building Regulations, Approved Document E 2003 (including the subsequent amendments in 2004). The system includes a 22mm P5 V313 chipboard bonded to melamine-free 8mm thick APF.

CHARACTERISTICS
  • Great acoustic properties,
  • Able to meet values prescribed by the Approved Document E of the Building Regulations, when installed as part of a complete party floor construction,
  • Includes a moisture-resistant chipboard,
  • especially designed for bathrooms and kitchens,
  • can comply with Code for Sustainable Homes.
APPLICATION

Isocheck Primo 30 is applicable over existing floorboards on traditional and composite steel and timber joist floors.

INSTALLATION
Prior to installation of the system, the following considerations must be taken into account:
  • all invasive fittings must be properly treated;
  • all structural wall should be sealed;
  • the sub-floor, which must be clean and dry, should be covered with proper insulation layer consisting of mineral wool insulation, added between the floor joists;
  • the entire structure needs to be watertight;
  • the product must be kept and stored in dry conditions.

Installation should begin with at the furthest point from the entrance, while the decking must follow a stretcher-bond pattern. The boards are pushed over the joints which have been treated with a proper adhesive added both on top of the tongue and bottom of the groove. It is advised that stud partitioning should be built from the sub floor and that flanking strips should be added for improved insulation performance of the walls and floors. Once the entire system has been installed, the boards should be protected from potential damage with a proper finish layer added on top. All skirting must be isolated from the floor surface and new ceiling boards installed prior to installing the system, in order of avoiding potential flanking transmission.

CERTIFICATION
The product is in compliance with:
  • Approved Document E of the Building Regulations,
  • It can comply with Code for Sustainable Homes.
This product is listed in the following categories and systems (click to show).