Knauf Aquapanel Water Barrier - Water-Resistant, Wind-Tight Membrane for Exterior Cement-Board Systems - 1.5m x 50m roll

- Product Code: A1-3089
- Delivery Time: 5 - 7 days
- Brand: Knauf (Tech. support: 08000304135)
- Model: 1.5m x 50m - 75m2

Knauf Aquapanel Water Barrier - Water‑Resistant, Wind‑Tight Membrane for Exterior Cement‑Board Systems - 1.5m x 50m roll
Knauf Aquapanel Water Barrier is a high‑diffusion, water‑resistant and wind‑tight membrane installed directly behind Aquapanel Cement Board Outdoor to stop any moisture that passes behind the boards from entering the wall structure. It provides superior air and moisture management, forming the essential second water‑shedding layer in the Knauf façade system. Aquapanel Water Barrier is a multi‑layer polypropylene membrane engineered to be highly vapour‑open (sd ≈ 0.03 m) while remaining rainproof and wind‑tight. Installed as a continuous layer behind Aquapanel Cement Board Outdoor, it prevents water ingress, protects the wall structure, and supports long‑term façade durability.
It is suitable for lightweight steel‑frame, timber‑frame, and direct‑boarded exterior wall systems. It provides a reliable, vapour‑open yet water‑resistant protective layer, ensuring that Aquapanel façade systems perform as intended. Its durability, ease of installation and full Knauf system compatibility make it a standard component in modern exterior wall construction.
Coverage: approx. 1.10 m² per m² of wall area
APPLICATION
- Secondary water‑shedding layer behind Aquapanel Cement Board Outdoor
- Air and moisture management in exterior wall systems
- Protection of timber or steel‑frame structures
- Direct‑boarded façade systems requiring a wind‑tight membrane
CHARACTERISTICS
- Water‑resistant membrane - prevents moisture entering the wall behind Aquapanel boards.
- Wind‑tight layer - improves air‑tightness and façade performance.
- Highly vapour‑open - sd ≈ 0.03 m for safe moisture diffusion.
- UV‑resistant - suitable for temporary exposure during installation.
- Robust polypropylene construction - multi‑layer fleece for strength and durability.
- Easy installation - fixed with tape or staples; overlaps ≥10 cm.
INSTALLATION
- Start at the bottom of the wall,
- Vertical and horizontal joints must overlap at least 10 cm.
- Vertical joints may be executed only on profiles.